The Army had hired a firm to turn the explosives into harmless waste, but then dropped it in favor of a controlled blast that could launch lead dust across Iowa.
The Army awarded a contract to MuniRem Environmental, a Georgia-based firm that uses chemicals to neutralize munitions. But it canceled the deal two months later, citing safety concerns, opting to blow up nearly five tons of the material instead.
The Army did not respond to questions about its canceled deal with MuniRem and why it chose to blow up the dangerous material. The details about the MuniRem contract have not previously been reported.
Mr. Nzengung of MuniRem said the company has filed public records requests seeking more information on why its technology was dismissed, and has not received a response.


Why did the military let it reach this point though? Shouldn’t they get rid of this stuff before it reaches the point where the only option is blowing it up?
This sort of thing always happens. It would have been purchased for some project decades back and since then, the senior leadership has swapped out several times. This was always on someone’s list but never on someone’s radar until it was too late.
Tl;dr negligence on the part of the contractor who was supposed to handle it
(America Ordinance LLC btw in case anyone needs to panic sell)